Story written by Donald Rainey, Water Resources Regional Specialized Agent, UF/IFAS Extension
In 2024, the Pinellas County water-quality monitoring team identified significant nutrient concerns in the Church Creek watershed, prompting an immediate shift in operations and environmental management at the City of Largo Golf Course. Largo Golf Course management developed a rapid, science-based response strategy. Rather than relying on assumptions or short-term fixes, Pinellas County Public Works and UF/IFAS Extension partnered directly with Largo’s golf management. Today, that intervention is delivering verified results: August 2026 sampling documented lower nutrient concentrations and marked chlorophyll reductions in the facility’s North Pond system, demonstrating that targeted operational adjustments, BMPs, and vegetative restoration efforts are actively reviving water quality.
Layering Practical Turf Care with Science-Based BMPs
To protect nearby surface and groundwater resources, the facility established a formal draft environmental policy that aligns daily grounds operations with Florida Golf Course Best Management Practices (BMPs) and Audubon environmental principles. On the fairways and greens, the turf management team upgraded fertilizer and chemical application schedules to reduce inputs and prevent runoff from washing into course ponds during heavy downpours.
These on-the-ground practices are guided by an organized Environmental Working Group structure that unites course operators, university specialists, and county environmental scientists into dedicated teams:
- Environmental Policy & Audubon Certification: Advancing certification milestones in the UF/IFAS Extension, Golf Course Superintendent BMP Training, and internationally recognized Audubon Cooperative Sanctuary Program for Golf.
- Nutrient Management & Integrated Pest Management (IPM): Balancing high-quality turf playability with reduced chemical inputs to safeguard local groundwater.
- Infrastructure Planning & Watershed Assessment: Aligning golf course drainage and stormwater systems with regional hydrological models.
- Water-Quality Monitoring & Evaluation: Tracking ecological health and water quality parameters across four primary pond systems.
Turning Monitoring into an Active Diagnostic Investigation
A cornerstone of the initiative is a comprehensive monitoring program evaluating four primary pond basins across the property. Pinellas County Certified Water Technicians systematically measure temperature, dissolved oxygen, suspended solids, bacterial indicators, and nutrient gradients.
When recent testing detected elevated nutrient spikes within the East Pond, project partners framed the data not as an operational setback, but as an active diagnostic investigation. Rather than relying on guesswork or cosmetic treatments, the team is evaluating inflow patterns, hydrologic retention times, and off-site drainage influences to pinpoint the nutrient source and guide adaptive management.
| “The monitoring program gives us the ability to evaluate what is working, identify concerns early, and make informed decisions. Our goal is continuous improvement and protecting the waterways connected to our golf course.”
— Mark N. Abdo, Recreation Program Manager, City of Largo Golf Course |
Statewide Recognition for Collaborative Environmental Leadership
The cross-functional initiative—guided by Don Rainey of UF/IFAS Extension, Mark Abdo, Course Director and Superintendent Charles Scott, Ryan Ryczek of Pinellas County Public Works, Brooke Driskell and county environmental staff, and Pinellas County Extension Director JP Gellermann.
This group has earned statewide recognition. In October 2024, the Florida Turfgrass Association awarded the City of Largo Golf Course the President’s Award for Environmental Stewardship, highlighting the partnership’s strategic planning, reduced chemical inputs, stormwater treatment enhancements, and habitat improvements.
The project was also named a runner-up for the Florida Department of Environmental Protection (FDEP) Southwest District 2026 Stewardship Award and continues to make steady progress through the Audubon Cooperative Sanctuary Program for Golf, serving as a regional benchmark for sustainable sports turf management.

Looking Ahead: Engineering Watershed Resilience for the Future
The initiative is moving into its most ambitious phase yet: a comprehensive engineering evaluation of course-wide stormwater and drainage infrastructure. Developed in close coordination with Pinellas County specialists, this study will evaluate underground conveyance pathways, inter-pond hydraulic connectivity, flooding vulnerabilities, and external off-site runoff influences.
According to Don Rainey, collaboration has been essential to addressing these complex hydrological challenges. County staff have provided technical monitoring, watershed evaluations, grant-supported pond plantings, and guidance on optimizing nutrient management, while also adopting UF/IFAS Extension checklist protocols.
By linking field monitoring data directly to long-term municipal capital planning, the City of Largo and its partners are ensuring that the golf course remains a functional, resilient anchor of the Church Creek watershed for decades to come.
If you are interested in hearing their story, register for the upcoming UF/IFAS Pinellas County 8th Annual Virtual Green Infrastructure Workshop 2026 hosted by JP Gellerman, Pinellas County Extension. Green Infrastructure Workshop 2026 Tickets, Thursday, November 19 • 9 AM – 4 PM EST | Eventbrite
Story Contact: Don Rainey, UF/IFAS Extension, drainey@ufl.edu